Procedure for Managing the Material Flow of Ready-Mixed Concrete in Construction Site Organization
Keywords:
procedure, material flow management, ready-mix concrete, civil works organizationAbstract
The management of ready-mixed concrete material flow plays a fundamental role in the organization of construction projects. Its proper management and control are key to ensuring structural quality and achieving optimization of resources, time, and costs for each project. The lack of a specific procedure governing the management of ready-mixed concrete material flow results in wasted resources and missed deadlines. Therefore, the objective of this research is to design a procedure for managing the material flow of ready-mixed concrete in construction site organization. This procedure consists of four stages and 10 steps, taking into accounts flowcharts, process maps, and worksheets as management tools that allow for the identification of problems affecting the organization of the project and contribute to the achievement of its objectives. These processes have a satisfactory impact on improving the efficiency and effectiveness of achieving the economic objectives, deadlines, and quality required in a construction project.
References
Abreu, (2018). Procedimiento para la organización de obras constructivas con enfoque a procesos. Tesis de Maestría. Universidad de Holguín Oscar Lucero Moya.
Arnaíz, M. M. (2012). Organización de obras arquitectónicas. Camagüey: Corporación UNECA.
Arroyo Pérez, R. (2016). Problemas en la gestión de la cadena de Suministro en las pymes de la construcción: una revisión de la literatura. Máster universitario en edificación. Especialidad gestión. Recuperado de https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://riunet.upv.es/handle/10251/69166&ved=2ahUKEwi2lpy17KaOAxXBQjABHXmqKhcQFnoECBYQAQ&usg=AOvVaw197mmIS0GUc6TGSn01nqrz
Cabrera, H. R., Medina León, A., Abab Puente, J., & Nogueira Rivera. (2015). La integración de Sistemas de Gestión Empresariales, conceptos, enfoques y tendencias. Ciencias de la Información, vol. 46(núm. 3), pp. 3-8.
Dubois, A., & Gadde, L.-E. (2002). Systematic combining: An abductive approach to case research. Journal of Business Research, 55(7), 553–560.
Egan, G. (1998). The Skilled Helper: A Problem-Management Approach to Helping. Pacific Grove CA: Brooks Cole.
Espinet S. (1995). Consideraciones sobre la especialidad de diseño: Organización de obras. Grupo Universitario de Dirección Integrada de Proyecto. Instituto Superior Pedagógico José Antonio Echeverría.
Espinet Vázquez, S., & Notario de la Torre , R. (1989). Organización de obras. Ciudad de la Habana.Tomo I. Editorial ISPJAE.
Espinosa (2018). La organización de obras y su aplicación en la enseñanza de las carreras de ingeniería civil y arquitectura en los nuevos planes de estudios. III Taller Nacional de Calidad y Organización de Obrasen las Construcciones. Camagüey, Cuba.
Fonseca, C. (2011). Mejoramiento de los procesos de planificación de obras a partir de la introducción de conceptos de gestión logística soportados en TIC, para el sector de la construcción en Colombia. Medellín, Colombia: Universidad Eafit Escuela de Ingeniería.
Green, S. D., Fernie, S., & Weller, S. (2005). Supply chain management in construction: a critical review. Construction Management and Economics, 23(7), 711-722.
Heredia, R. (1995). Dirección integrada de proyectos. 2da edición. Madrid: Universidad Politécnica de Madrid.
Howland, J. J. (2010).Tecnología del Hormigón para Ingenieros y Arquitectos. Pueblo y Educación. Cuba.
Koskela, L. (1992). Application of the new production philosophy to construction. Technical Report No. 72. Stanford University.
Latham, M. (1994) Constructing the Team: Final Report of the Government/Industry. Review of Procurement and Contractual Arrangements in the UK Construction Industry. HMSO ISBN011752994x.
Medina, A., Nogueira, D., & Hernández, A. (2010). Gestión por procesos: un enfoque para la mejora continua. Ingeniería Industrial, 31(1), 1-10.
NC 120. (2014). Hormigón hidráulico, Especificaciones. Oficina Nacional de Normalización. https://www.studocu.com/latam/document/universidad-de-la-habana/teoria-de-la-comunicacion/nc-120-a2014-74p-isi-uwu/99875067
O'Brien, W. J., Formoso, C. T., Ruben, V., & London, K. (2008). Construction supply chain management handbook. CRC press.
Pmbok (2015). A Guide to the Project Management Body of Knowledge. Pennsylvania Project Management Institute.
Rodríguez, E., & Sánchez, F. (2021). Sostenibilidad y eficiencia en la producción de hormigón premezclado. Journal of Sustainable Construction, 10(1), 45-58.
Sholeh, B., & Sa’diah, H. (2018). Pengaruh motivasi belajar dan fasilitas belajar terhadap prestasi belajar IPS Siswa SMP Nurul Iman Parung Bogor tahun ajaran 2017/2018. PEKOBIS Jurnal Pendidikan, Ekonomi Dan Bisnis, 3(2), 12-20.
Tabares Betancur, M., y Lochmuller, C. (2013). Propuesta de un espacio multidimensional para la gestión por procesos. Un estudio de caso. Estudios Gerenciales, 29, 222- 230.
Thunberg, M., & Persson, F. (2014). Material flow management in construction projects: a literature review. Construction Innovation, 14(3), 301-318.
Viteri Moya, J. (2012). Modelo y procedimiento para gestionar la responsabilidad social universitaria. Aplicación en la Facultad de Ciencias de la Ingeniería de la Universidad Tecnológica Equinoccial, Ecuador. (Tesis Doctoral.). Universidad de Matanzas.
Vrijhoef, R., & Koskela, L. (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 6(3-4), 169-178.
Vrijhoef, R. (1998). The production of construction materials: a supply chain perspective. Eindhoven University of Technology
Published
Issue
Section
License
Copyright (c) 2025 MUNDO RECURSIVO

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.